Plastics Manufacturing Technologies

A Comparative guide of RapidMade's plastic printing technologies and materials.

 

3D Printed Plastics

Fused Deposition Modeling (FDM)

Standard Materials: ABS

Relative Cost: ★★☆☆☆

Machine Finish: ☆☆

ABS Prime Finish

Typical Lead Time:  2-5 Business Days

Specialty Materials: PC, nylon, ULTEM and many more (See FDM page)

Relative Cost: ★★★★☆

Machine Finish: ☆☆

Typical Lead Time: 3-7 Business Days

FDM Pros: Very high accuracy on large parts, diverse materials, rigid and tough, fast turnaround, sparse fill for light weight with high part volumes

FDM Cons: Striated machine finish, low resolution on features under 0.030"

 

Polyjet (Objet) Printing

Standard Materials: Acrylic and polypropylene-like

Relative Cost: ★★★☆☆

Machine Finish: 

Typical Lead Time:  2-5 Business Days

Specialty Materials: ABS-like, various elastomers and digital materials (See Polyjet Page)

Relative Cost: ★★★★☆

Machine Finish: 

Typical Lead Time: 3-7 Business Days

Polyjet Pros: Top quality detail, best surface finish, clear material option, embedded textures, fine features, single piece mechanical assemblies

Polyjet Cons: Resins - not industrial thermoplastics, lower heat resistance, better for smaller parts

 

Selective Laser SIntering (SLS)

Standard Materials: Nylon and glass filled nylon

Relative Cost*: ★★★☆☆

Machine Finish: ★★★☆☆

Typical Lead Time:  5-10 Business Days

Specialty Materials: Rubber (TPU), carbon filled nylon and other composites (See SLS page)

Relative Cost: ★★★★☆

Machine Finish: ★★★☆☆

Typical Lead Time: 5-10 Business Days

SLS Pros: Real thermoplastic and thermoplastic composites, uniform matte finish, great thermal and mechanical properties

SLS Cons: Large and thick parts can warp, longer production lead times, porous material, low resolution on features under 0.030"

*In volume SLS can become one of the least expensive printing processes.

 

Large Format 3D Printing

Standard Materials: Epoxy infused Acrylic

Relative Cost*: ★★★☆☆

Machine Finish: ★★★☆☆

Typical Lead Time:  5-10 Business Days

Specialty Materials: Sand (Sand Casting), Low Ash Burnout Resin (Investment Casting)

Relative Cost: ★★★☆☆

Machine Finish: ★★★☆☆

Typical Lead Time: 5-10 Business Days

Large Format Pros: Largest build size of any 3D printers, cost effective for large parts, casting patterns and molds without any additional tooling

Large Format Cons: Not as durable as SLS or FDM, not intended for small objects, longer production lead times compared to smaller printers

 

Traditional Manufacturing

Machining

Standard Materials: ABS, HDPE, acetal, nylon, aluminum, stainless steel

Relative Cost: Quantity and lead dependent

Machine Finish: ★★★☆

Typical Lead Time:  5-15 Business Days

Specialty Materials: Custom materials available on request

Relative Cost: Quantity and lead dependent

Machine Finish: ★★★☆

Typical Lead Time: 5-15 Business Days

Machining Pros: Scales well with volume, widest range of materials, high tolerance and good surface finish

Machining Cons: Generally more expensive at low volumes and higher complexity than 3D printing, more design limitations than 3D printing

 

Urethane Casting

Standard Materials: Rigid and rubber urethane, acrylic, resins,  plaster, composites

Relative Cost: ★★☆☆

Machine Finish: ★★★☆

Typical Lead Time:  5-15 Business Days

Specialty Materials: Custom materials available on request

Relative Cost: ★★☆☆

Machine Finish: ★★★☆

Typical Lead Time: 5-15 Business Days

Urethane Casting Pros: Repeatable textured finishes, good for over-molding, mimics injection molding faster and with lower tooling cost

Urethane Casting Cons: 5-10 days required to make tooling, moderate tooling costs, does not use thermoplastic, higher part cost than injection molding

Injection Molding

Standard Materials: ABS, polycarbonate, polypropylene, polyethylene,  nylon, TPU

Relative Cost: Quantity and lead dependant

Machine Finish: ★★

Typical Lead Time:  4-12 Weeks

Specialty Materials: Custom materials available on request

Relative Cost: Quantity and lead dependant

Machine Finish: ★★

Typical Lead Time: 4-12 Weeks

Injection Molding Pros: Highest quality, lowest cost production parts available in large quantities, expedited production in as little as four weeks

Injection Molding Cons: High tooling costs and longer lead times